City of San Leandro

Neptune Drive Project Status

Neptune Drive Project Status

Updated 10/15/2020 In this post, CivicMic provides the latest update for the City of San Leandro Neptune Drive Shoreline Flood Protection Project (“Neptune Drive Project”).   The Neptune Drive Project for the construction of a new levee will be funded by special assessments added to the property tax bill of approximately 1,055 parcels that were recently designated by FEMA as being in the 100-year flood zone.  The new designation has resulted in the requirement by mortgage companies for costly flood insurance. The construction of the levee, in addition to another levee being built by the County, would cause FEMA to designate …

Neptune Drive Project Status Click Here to Read More »

Neptune Drive Project Cost

Neptune Drive Project Cost Estimate

In this post, CivicMic provides the Neptune Drive project cost estimate as additional support to previous posts addressing comments and questions received via the second online survey for the Neptune Drive Shoreline Flood Protection Project. If you are familiar with this topic, please scroll down to view the Neptune Drive project cost estimate. If you are new to this topic, please click on the links below to read our previous posts with valuable background information.   What is a Benefit Assessment District? Watch the Video of the Most Recent Community Meeting Neptune Drive Shoreline Flood Protection Project Update Neptune Drive Assessment …

Neptune Drive Project Cost Estimate Click Here to Read More »

Neptune Drive Levee Comments

Neptune Drive Levee: Comments From Second Online Survey – Part 2

In this post, CivicMic addresses additional comments and questions received via the second online survey for the proposed construction of the Neptune Drive levee in San Leandro, California.  Please click here to read Part 1 of this post series with answers to previous comments and questions received. Neptune Drive Levee Comments and Questions Received – Part 2 Question:  Please provide a breakdown of the total cost of the project. Answer:  The current estimated cost of the project is approximately $2.5 million, including assessment district formation costs.  Below is a general (rounded) breakdown of the project by category. $2,000,000 – Design, …

Neptune Drive Levee: Comments From Second Online Survey – Part 2 Click Here to Read More »

Neptune Drive Levee Comments

Neptune Drive Levee: Comments From Second Online Survey

In this post, CivicMic addresses comments and questions received via the second online survey for the proposed construction of the Neptune Drive levee in San Leandro, California.  The Neptune Drive Shoreline Flood Protection Project will be funded by special assessments added to the property tax bill of approximately 1,055 parcels that benefit from the construction of the Neptune Drive levee.  These 1,055 parcels were recently designated by FEMA as being in the 100-year flood zone resulting in the requirement by mortgage companies for costly flood insurance.  The construction of the levee, in addition to another levee being built by the …

Neptune Drive Levee: Comments From Second Online Survey Click Here to Read More »

Neptune Drive Shoreline Flood Protection Project Update

Neptune Drive Shoreline Flood Protection Project Update

3/26/2020 Update: The City has proposed a 10-year term, instead of 25 or 30 years, to reduce interest costs to property owners over the life of the assessment. Preliminary assessments and posts below have been updated and re-published.  Please click on the posts below to read the updated version. Neptune Drive Assessment District Preliminary Data Preliminary Assessments for the Neptune Drive Shoreline Flood Protection Project Neptune Drive Assessment:  7/29/2019 Informational Meeting Slides Background In this post, CivicMic provides a Neptune Drive Shoreline Flood Protection Project update.  If you are new to this topic, please read the following posts for background …

Neptune Drive Shoreline Flood Protection Project Update Click Here to Read More »

Neptune Drive Assessment Preliminary Data

Neptune Drive Assessment District Preliminary Data

3/25/2020 Update: Data updated to reflect amortization over 10 years instead of 30 years to reduce interest costs over the life of the assessment.  Click here for a status of the project. Introduction In this post, CivicMic shares the preliminary data per parcel, in a table, for the proposed Neptune Drive Assessment District.  The proposed Neptune Drive assessment will fund the construction of a levee (the Neptune Drive Shoreline Flood Protection Project).   The construction of the levee would cause FEMA to re-designate the parcels as no longer being in the flood zone resulting in an update of the Flood Insurance …

Neptune Drive Assessment District Preliminary Data Click Here to Read More »