Person typing on laptop with word "Budget" representing General Benefit Calculation Budget

General Benefit Calculation for Rolling Hills (LLMD 7)

Explanation of LMD 2023-7 General Benefit Calculation as it relates to the Budget

In this post, CivicMic provides a comprehensive explanation of the LMD 2023-7 General Benefit Calculation for landscaping and street lighting improvements. Notably, the post emphasizes Hilborn Road, which is a crucial factor in the calculation and has been requested by residents in the community. By reading this post, you can gain a deeper understanding of how Hilborn Road plays a significant role in the general benefit calculation for the improvement types and how the budget allocation is determined.

As discussed in the Engineer’s Report, traffic volume is utilized to help determine special benefits accruing to the District as opposed to the general benefits received by the public at large from the Landscaping and Street Lighting Improvements. As a result of that analysis, it was determined that weighted vehicle pass through factor is 56.93% for Hilborn Road and 24.40% for Martin Road as shown below.

Street Name Vehicle Trips Passing-Through District% of Total Roadway Design Capacity (1)Weighted Vehicle Pass-Through % Factor (2)
Hilborn Road50,40070.00%56.93%
Martin Road21,60030.00%24.40%
Total:72,000100%81.33%

  1. Equals (Vehicle Trips Passing Through District on Roadway / Total Vehicle Trips Passing Through District).
  2. Equals (% of Total Roadway Design Capacity x Pass Through %).

However, simply estimating the number of pass-through vehicle does not necessarily indicate the level of benefit accruing to vehicles passing through the District. As a result, we looked at each of the Improvements individually, utilizing the weighted vehicle pass through factors identified previously. For the street lighting Improvements, the percentage of street lights located along the respective roadway was multiplied by the weighted vehicle pass through factors identified previously in order to determine the effective general benefit percentage for the Street Lighting Improvements as shown below.

Roadways with Street LightsNumber of Street Lights% of StreetlightsWeighted Vehicle Pass-Through % FactorEffective General Benefit % (1)
Hilborn Road4914.89%56.93%8.48%
Martin Road82.43%24.40%0.59%
Interstate 8000100.00%-
Interior Streets27282.67%2.00%1.65%
Total:329  10.73%

  1. Equals (% of Streetlights x Pass-Through Percentage).

For the Landscaping Improvements, the percentage of the roadway with landscaping Improvements was multiplied by the weighted vehicle pass through factors identified previously in order to determine the effective general benefit percentage for the Landscaping Improvements as shown below.

Roadways with Landscaping ImprovementsFeet of Roadway with Landscaping Improvements% of Total Landscaping Improvements (1)Weighted Vehicle Pass-Through % FactorEffective General Benefit %
Hilborn Road9,67014.62%56.93%8.32%
Martin Road2,7924.22%24.40%1.03%
Interstate 801,4142.14%100%2.14%
Interior Streets52,25479.02%2.00%1.58%
Total:66,130  13.07%

  1. Equals (Feet of Roadway with Landscaping Improvements / 66,130).

Each of the above General Benefit percentages by Improvement Type were utilized to determine the final General Benefit percentage based upon the budget for each Improvement Type as shown below.

DescriptionLandscaping & Lighting Budget% of Budget Special BenefitAdmin Budget (3)TotalSpecial Benefit Points (SBP)Rate per SBP
Lighting Budget$51,9335.46%$46,361 (1)$4,678$51,03811,338$4.5015
Landscaping Budget899,04194.54%781,536 (2)80,997862,5336,940124.2865
Total$950,974 $827,897$85,674 (4)$913,57118,278 

  1.  Equals (Lighting Budget x (1 - 10.73%)).
  2.  Equals (Landscaping Budget x (1 – 13.07%)).
  3.  Includes $9,045 for County fees, $8,000 for Engineering/Consultant costs and $68,629 for City staff costs.
  4.  Off due to rounding.

The breakdown of the balance to be assessed is shown below. The General Benefit portion below totaling $123,077 will be paid by City and not the District.

DescriptionAmount
Total Cost of Improvements$1,036,648
Less General Benefit Portion (Lighting – 10.73%)(5,572)
Less General Benefit Portion (Landscaping – 13.07%)(117,505)
Adjustment due to rounding(5)
Total Cost of Improvements to Be Assessed$913,566

Please sign up below to receive updates via email and use the “Share this:” buttons to share this post with the community.  Your participation is very important.

Share this:

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top