Join Us in Planning Exciting Changes for the West Linda Community
In 2023, Yuba County was awarded a $21 million grant from California's Active Transportation Program to fund the West Linda Comprehensive Safe Routes to School Project. This project will enhance pedestrian connections and improve safety around local schools by constructing sidewalks, crosswalks, accessible ramps, bicycle lanes, and curbs.
In addition to sidewalks and bike lanes, the project includes the installation of storm drains and gutters to address standing water issues and reduce flood risk.
The West Linda Comprehensive Safe Routes to School Project will improve transportation and access within West Linda to make our community safer and more connected than ever before – improving how residents get around, whether it's walking, biking, or driving, and creating safer paths to schools and other key destinations.

Timeline
December 2024
Design reached 65% milestone
July 2025
Design plans & specifications at 95%
November 2025
Design plans & specifications at 100%
March 2026
Construction Bid Advertisement
April 2026
Construction Bid Opening
June 2026
Construction Contract Award
July 2026
Break Ground
Frequently Asked Questions
General Project Overview
Design, Construction, and Timing
Project Benefits and Community Impact
Resident Impact and Accessibility
Information From the Community Meeting
About the West Linda Safe Routes to School Project
Project Benefits Include:
- Enhanced safety and accessibility for students walking or biking to school, particularly those attending Cedar Lane Elementary and New Life Christian School
- Improved drainage infrastructure to prevent flooding and enhance community resilience
- Use eco-friendly techniques to repair roads, making them last longer and causing less harm to the environment
- Strengthened community connections with safer access to local destinations and amenities
Key Elements:
- Community Connectivity: Enhancing access to schools, parks, businesses, and community amenities, the project fosters safer and more convenient pathways for all residents, promoting a vibrant and connected West Linda community.
- Stormwater Drainage: Addressing existing flooding issues, the project includes designing a drainage system that aligns with the County's vision of a multi-use West Linda Drainage Basin. This system will manage runoff effectively and enhance community resilience.
- Utilities: The project involves coordinating the relocation of overhead poles, fire hydrants, sewer manholes, and water meters to accommodate the safe routes.
- Pavement Improvements: The project evaluates street improvement options, considering cost-effectiveness and sustainability.